Tuesday, April 12, 2011

Ribs

I made a decision. Single conduit lines down each wing, but I wanted to open up the pitot tube holes so I could fit in plumbing for angle of attack (AoA). Tonight I did that, this time with the step drill instead of a hole saw. I found the results were better...

Also, my conduit arrived from Vans with the tie downs. Thats about all I did tonight...

No comments:

Post a Comment